CONNECTING GENERATIONS&BRIDGING COMMUNITIES

Bridge Pier

http://memorialbridgeproject.com/wordpress/uploads/2012/02/kb-11.jpg

http://memorialbridgeproject.com/wordpress/uploads/2012/02/kb-11.jpg

Bridge Peir

To Minimize the Financial impact, the original Memorial Bridge Piers were restored. Steel micropiles were inserted into holes bored into the original piers. New concrete caps were poured on top of this. A fender system has also been implemented, so if a collision were to happen, the fender will absorb the energy and leave the pier undamaged.


Under Construction

  • Design
  • Construction
  • Connecting Generations
  • Bridging Communities
  • Contractors & Engineers